Site Prep

Site Prep

Site preparation begins and excavation equipment is brought on site as well as materials to frame the footings. 

Footing Forms

Footing Forms

Once the ground has been excavated, we bring in clean fill, compact and level it, then we can begin building forms for the concrete footings which will support the foundation of the house. 

Foundation Forms

Foundation Forms

Once the footings are in, we put up foundation forms and begin preparing the base for the lower level floor. In this picture, you can also see the weeping system which will be placed around the outside of the foundation. 

Framing

Framing

Once the foundation is in place, we apply a waterproofing membrane to the outside, place the weeping system and backfill so that we can begin framing. 

exterior_walls_framing_2.jpg
Exterior Framing

Exterior Framing

With the exterior walls framed in, we apply OSB to the outside walls.

 The middle wall which will help support the roof truss is erected next. 

The middle wall which will help support the roof truss is erected next. 

 Scaffolding is then put in place to help placing the roof truss go smoothly and as safe as possible. 

Scaffolding is then put in place to help placing the roof truss go smoothly and as safe as possible. 

 Roof truss are placed and we begin applying OSB to the roof to close things all in. 

Roof truss are placed and we begin applying OSB to the roof to close things all in. 

roof_construction.jpg
roof_sheathing.jpg
mid-construction.jpg
 With the roof closed in, we can go ahead and apply the shingles. 

With the roof closed in, we can go ahead and apply the shingles. 

 With the roof in place, we move on to insulating the basement floor so that concrete can be poured. Any plumbing that will be contained under the basement floor is also done at this time and sump pump and lift pumps are installed at this point as we

With the roof in place, we move on to insulating the basement floor so that concrete can be poured. Any plumbing that will be contained under the basement floor is also done at this time and sump pump and lift pumps are installed at this point as well. 

 Garage floor is insulated and ready to pour as well. 

Garage floor is insulated and ready to pour as well. 

 While we're waiting for the newly poured cement to dry in the basement, we begin framing the interior walls upstairs. 

While we're waiting for the newly poured cement to dry in the basement, we begin framing the interior walls upstairs. 

 With the concrete in place and dry, we also begin framing the downstairs walls. 

With the concrete in place and dry, we also begin framing the downstairs walls. 

 Outside the house wrap goes on. This helps make the house air-tight while wicking away moisture. 

Outside the house wrap goes on. This helps make the house air-tight while wicking away moisture. 

 House wrapping finished. 

House wrapping finished. 

 With the house wrap finished, we can begin installing windows and doors. 

With the house wrap finished, we can begin installing windows and doors. 

 Interior stairs

Interior stairs

 Ledger boards for deck are installed. 

Ledger boards for deck are installed. 

 Electrical and plumbing are started inside. 

Electrical and plumbing are started inside. 

 Panel getting wired. 

Panel getting wired. 

 Siding being installed

Siding being installed

 Siding the west wall complete. 

Siding the west wall complete. 

 Ladders! 

Ladders! 

deck_ledger2.jpg
 With all the electrical and plumbing in place, the insulation can go in and the drywall can begin going up. 

With all the electrical and plumbing in place, the insulation can go in and the drywall can begin going up. 

 Drywall Installation

Drywall Installation

 With the drywall hung, the seam filling process begins. 

With the drywall hung, the seam filling process begins. 

IMG_3525.JPG
IMG_3519.JPG
First coat of paint

First coat of paint

First coat of paint can go on after seamfilling 

 Closets and trim 

Closets and trim 

stairs.jpg
ballusters.jpg
flooring.jpg
flooring2.jpg
flooring4.jpg
flooring5.jpg
flooring3.jpg
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Previous Next
Site Prep
Footing Forms
Foundation Forms
Framing
exterior_walls_framing_2.jpg
Exterior Framing
 The middle wall which will help support the roof truss is erected next. 
 Scaffolding is then put in place to help placing the roof truss go smoothly and as safe as possible. 
 Roof truss are placed and we begin applying OSB to the roof to close things all in. 
roof_construction.jpg
roof_sheathing.jpg
mid-construction.jpg
 With the roof closed in, we can go ahead and apply the shingles. 
 With the roof in place, we move on to insulating the basement floor so that concrete can be poured. Any plumbing that will be contained under the basement floor is also done at this time and sump pump and lift pumps are installed at this point as we
 Garage floor is insulated and ready to pour as well. 
 While we're waiting for the newly poured cement to dry in the basement, we begin framing the interior walls upstairs. 
 With the concrete in place and dry, we also begin framing the downstairs walls. 
 Outside the house wrap goes on. This helps make the house air-tight while wicking away moisture. 
 House wrapping finished. 
 With the house wrap finished, we can begin installing windows and doors. 
 Interior stairs
 Ledger boards for deck are installed. 
 Electrical and plumbing are started inside. 
 Panel getting wired. 
 Siding being installed
 Siding the west wall complete. 
 Ladders! 
deck_ledger2.jpg
 With all the electrical and plumbing in place, the insulation can go in and the drywall can begin going up. 
 Drywall Installation
 With the drywall hung, the seam filling process begins. 
IMG_3525.JPG
IMG_3519.JPG
First coat of paint
 Closets and trim 
stairs.jpg
ballusters.jpg
flooring.jpg
flooring2.jpg
flooring4.jpg
flooring5.jpg
flooring3.jpg

Your new home awaits.

Start the process →
Back to Top
Doyle Feehan Construction, 1134 Pleasant Grove Rd, York, PE, C0A 1P0, Canada9026290726